FAQ

Straight answers.

The questions plant directors, body and coating engineers and quality leads ask in the first meeting, answered as plainly as we can, including where the answer is planned rather than done.

12 questionsPre-launch answersUpdated 2026-10-09

run_9b4e27 · agent graph · car 07 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.order ✓ SUCCEEDED 02 · line_logistics takt.sequence ✓ SUCCEEDED 03 · fitura twin.simulate ✓ SUCCEEDED 04 · weld_structure weld.sequence ✓ SUCCEEDED 05 · orchestrator approve.human ◆ APPROVAL 06 · bogie_gear bogie.torque ✓ SUCCEEDED 07 · coat_livery coat.cure ✓ SUCCEEDED 08 · marry_couple marry.align ✓ SUCCEEDED 09 · quality_anomaly inspect.fuse ✓ SUCCEEDED 10 · conformance car.release ✓ SUCCEEDED

Illustrative scenario: Car 07 of a 4-car metro consist · shell line B · bogie shop · booth 2 · marriage station, one car, one approval gate

FAQ

Everything we get asked

Twelve questions. If yours is not here, ask it.

Only within an explicit tool allow-list with per-tool rate and magnitude limits, inside the approved control-plan envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Railira writes nothing. Heat-input and weld-sequence changes, schedule release and car release stay with a named approver.

Run timeline · scenario

One scenario run, step by step

Every Railira run is an ordered, inspectable sequence. This is run_9b4e27: Car 07 of a 4-car metro consist · shell line B · bogie shop · booth 2 · marriage station. Scenario completes in 10 steps with one approval gate. Shell geometry held inside tolerance after a twin-ranked weld sequence, one heat-input change approved by the shift weld engineer, two torque traces routed to rework before brake test, the livery cure window protected in the sequence, marriage interface inside tolerance, car released with full genealogy.

run_9b4e27 car 07 · 4-car metro consist illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.8 s

    Plant Orchestrator · Pulled the work packages for car 07 from MES and PLM: aluminium extrusion shell, EN 15085 weld class per joint, control-plan geometry tolerances, bogie torque specifications, livery recipe and cure window, fit-out and marriage sequence. Locked the approved control-plan envelope for the shift.

  2. 02 takt.sequence SUCCEEDED 41 s

    Line-and-Logistics · Sequenced the shift against live readiness: booth 2 cure window, bogie B-14 readiness, brake-test slot at 13:40, AMR fleet state and kit inventory. The plan moves car 07 marriage behind car 06 to keep the cure window and the test slot.

  3. 03 twin.simulate SUCCEEDED 58 s

    Train Twin · Simulated 18 candidate weld sequences for the roof-to-sidewall joints on the as-built twin and ranked them on predicted distortion, door-aperture geometry and heat input. Sequence #6 keeps the aperture inside tolerance with 2% less heat input than the standing sequence.

  4. 04 weld.sequence SUCCEEDED 3 m 12 s

    Weld-and-Structure · Recommended sequence #6 and the matching clamping plan to the shell line. Seam vision and laser-tracker geometry confirmed the roof-to-sidewall joints inside the control-plan tolerance on the first four seams.

  5. 05 approve.human APPROVAL 52 s

    Plant Orchestrator · Sequence #6 lowers heat input on the roof joints 2% below the standing weld procedure. Heat-input changes stay with a named engineer, so the step was held for the shift weld engineer and approved at 06:12:44 with the twin evidence attached.

  6. 06 bogie.torque SUCCEEDED continuous

    Bogie-and-Running-Gear · Press-fit curves and torque traces on bogie B-14 read at the station. Two traction-motor mounting traces fell outside the expected profile and were routed to rework before brake test; the remaining safety-critical joints verified to spec.

  7. 07 coat.cure SUCCEEDED continuous

    Coat-and-Livery · Booth 2 humidity and temperature, film thickness and flash time watched through the livery pass. One masking misalignment on the door band flagged by booth vision before the second coat; the cure window held and handed to the sequence as a hard constraint.

  8. 08 marry.align SUCCEEDED 2 m 05 s

    Marry-and-Couple · Carbody and bogie scans compared against target interface geometry before the lift. Fit-out readiness confirmed by Fitout-and-Interior for doors and glazing. Marriage guided inside tolerance; coupler and gangway checks verified and written to the twin.

  9. 09 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Weld and coating vision, in-line metrology, torque, wiring continuity and brake-test results fused at the edge across the car. Every finding localised to station, work package and shift, with the two torque reworks and the masking flag already closed.

  10. 10 car.release SUCCEEDED 1 m 30 s

    Conformance · Car 07 released: genealogy written (weld records per joint, geometry scans, torque traces, coating recipe and cure record, fit-out checks, marriage interface, approvals, test results) and dispositioned against the control plan and IRIS / ISO/TS 22163 criteria with cited evidence for the quality engineer's sign-off.

Autonomy

Four levels, set per agent and per tool

A rolling-stock plant does not go from manual to unattended in one step. Railira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk actions. Weld parameters, schedule release and car release stay with named humans until acceptance is earned.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · ShadowReads weld, metrology, torque, coating, wiring, test, robot and MES signals; predicts and recommends; writes nothingRuns the line as today; compares predictions to inspection and engineer outcomesShadow mode; baseline measured from the plant's own records
L2 · AssistProposes weld-sequence, geometry, coating, torque and sequencing moves with evidence, confidence, envelope and rollback pathApproves each move in the review consoleAssist mode; accuracy and ROI proven against the baseline
L3 · BoundedExecutes pre-approved low-risk actions: inspection routing, rework priority, kit feeding, robot path variants and parameter adjustments inside approved boundsApproves heat-input and weld-sequence changes, schedule release and car releaseGraduated autonomy, after audited accuracy and ROI and safety gates
L4 · ScaledSupervised weld-parameter adaptation inside pre-approved control-plan envelopes, across lines and plantsSets the envelope; reviews the shift record and the evaluation resultsPlanned; after IRIS, plant and OEM acceptance is earned
Guardrails

An agent that can change a weld sequence needs a leash

Railira writes to production systems. Every capability is scoped, every write is policy-checked against the approved control plan, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent acts only through an explicit tool allow-list, inside per-tool rate and magnitude limits and the approved control-plan envelope for the car type.
  • Policy engine before every write. Autonomy level, shift, car type, interlock state and operator presence are evaluated before a recommendation becomes a write to a robot, MES, torque tool or work package.
  • Human-in-the-loop gates. Heat-input and weld-sequence changes, schedule release and car release wait for a named approver. High-risk changes remain human-approved until IRIS, plant and OEM acceptance is earned.
  • Immutable audit log. Append-only and exportable. Every action records source evidence, the control-plan envelope, confidence, estimated quality and takt impact, rollback path, approver and car scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the robot, PLC or station's last known-good state. Safety systems and interlocks are never in Railira's path.
  • Tenant and program isolation. Designs, control plans, program data, models and memory never cross a customer boundary. On-prem and plant-edge deployment is available for regulated plants.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type I and OEM cyber reviewCloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
IRIS and regulatory assurance packagesDisposition and genealogy evidence QUEUED Planned, 6 to 12 months; not a certification claim
Standards-cited reasoningControl plans, EN 15085, IRIS / ISO/TS 22163, TSI, AAR, APTA, torque and brake-test procedures RUNNING In the design, every answer cites its source
Per-tenant and program isolationDesigns, control plans, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentRegulated plants RUNNING Design option

Read the security overview

Pricing

Priced per process, per plant, per network

Land on one workflow with a measured baseline. Expand by process, module and autonomy level. Outcome components are available on rework, line uptime, first-time-through and takt. Annual prepay carries a 15 to 20% discount.

Billing period
Process $16,000 per production process or line area / month · billed monthly

Carbody, coating or assembly autonomy or inspection AI for one process. For plants validating ROI on the wedge.

  • One process or line area, one agent module
  • Plant-edge inference node included
  • Controller and sensor reads, guarded recommendations
  • Run log, audit trail, car genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $1M to $15M ACV

Multi-plant OEM and tier-1 networks standardising on Railira, with custom carbody, coating, torque and takt models and a plant-edge fleet.

  • Multi-plant fleet management
  • Custom carbody, coating, torque and takt models
  • Plant-edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
Get started

Ask the question we missed

Start with one carbody, bogie, coating, fit-out or sequencing process and one measurable baseline. A paid pilot on weld and geometry, torque assurance, livery defects or line sequencing shows the number before you commit further.