Pricing

Priced per process. Justified per car.

Process, Plant and Enterprise. The Process tier covers one autonomy or inspection module on one production process or line area. Plant covers the whole plant. Enterprise is for multi-plant OEM and tier-1 networks. Annual prepay carries a 15 to 20% discount and outcome components are available on rework, line uptime, first-time-through and takt.

Process · $16,000 per process / monthPlant · $120,000 / monthEnterprise · $1M to $15M ACV

Packaging logic

Land, expand, monetise the value

  1. Land. Low-friction entry on one process with a clear ROI metric, on the Process tier.
  2. Expand. Processes, plants, network sites and autonomy level, into Plant and Enterprise.
  3. Monetise value. Usage and outcome pricing on rework, line uptime, first-time-through and takt capture upside as the agent does more of the work.

Floor pricing is protected. Discounts are traded for term length and a flagship OEM or fleet-program reference.

Pricing

Priced per process, per plant, per network

Land on one workflow with a measured baseline. Expand by process, module and autonomy level. Outcome components are available on rework, line uptime, first-time-through and takt. Annual prepay carries a 15 to 20% discount.

Billing period
Process $16,000 per production process or line area / month · billed monthly

Carbody, coating or assembly autonomy or inspection AI for one process. For plants validating ROI on the wedge.

  • One process or line area, one agent module
  • Plant-edge inference node included
  • Controller and sensor reads, guarded recommendations
  • Run log, audit trail, car genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $1M to $15M ACV

Multi-plant OEM and tier-1 networks standardising on Railira, with custom carbody, coating, torque and takt models and a plant-edge fleet.

  • Multi-plant fleet management
  • Custom carbody, coating, torque and takt models
  • Plant-edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
Compare

What is in each tier

Products are licensed per process or line area on the Process tier and bundled on Plant and Enterprise.

What is in each tier
CapabilityProcessPlantEnterprise
Processes covered1All on siteAll in network
Agent modules1 of 5 productsAll agentsAll agents + custom models
Train-and-plant twin (Fitura)NoIncludedCustom program twins
Plant-edge nodeIncludedPer processFleet managed
Guarded writesScoped toolsAll scoped toolsNetwork policy
Car genealogyIncludedIncludedIncluded + assurance packets
Autonomy levelsL1 to L2L1 to L3L1 to L4 when accepted
SSO and RBACNoPlannedPlanned, with approval chains
On-prem deploymentNoOptionalIncluded
SupportBusiness hours24/724/7 + named engineer
Indicative price$16,000/mo$120,000/mo$1M to $15M ACV
ROI

The arithmetic a plant runs

We do not publish savings percentages because we have not measured any yet. These are the inputs a plant brings to the pilot baseline, and the outputs the pilot measures.

Inputs you already have

  • Weld rework and geometry escapes per car, with the joint and station behind each
  • Repaint events and coating rework per car
  • Torque and press-fit escapes found at brake test or in service
  • Line stoppage minutes and takt loss per shift
  • Quality-gate holds, acceptance delays and non-conformance cycle time
  • First-time-through per car type

What the pilot measures

  • Weld, geometry, coating and torque prediction accuracy against metrology, test and audit baselines on the wedge workflow
  • Rework reduction and first-time-through improvement
  • Line-uptime and takt improvement
  • Quality-hold and scrap reduction
  • A hard ROI metric tied to the Process price
  • Conversion of the design partner to paid
Run timeline · scenario

What you are actually buying

A run engine that produces this record on every car, every shift, on every process you license.

run_9b4e27 car 07 · 4-car metro consist illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.8 s

    Plant Orchestrator · Pulled the work packages for car 07 from MES and PLM: aluminium extrusion shell, EN 15085 weld class per joint, control-plan geometry tolerances, bogie torque specifications, livery recipe and cure window, fit-out and marriage sequence. Locked the approved control-plan envelope for the shift.

  2. 02 takt.sequence SUCCEEDED 41 s

    Line-and-Logistics · Sequenced the shift against live readiness: booth 2 cure window, bogie B-14 readiness, brake-test slot at 13:40, AMR fleet state and kit inventory. The plan moves car 07 marriage behind car 06 to keep the cure window and the test slot.

  3. 03 twin.simulate SUCCEEDED 58 s

    Train Twin · Simulated 18 candidate weld sequences for the roof-to-sidewall joints on the as-built twin and ranked them on predicted distortion, door-aperture geometry and heat input. Sequence #6 keeps the aperture inside tolerance with 2% less heat input than the standing sequence.

  4. 04 weld.sequence SUCCEEDED 3 m 12 s

    Weld-and-Structure · Recommended sequence #6 and the matching clamping plan to the shell line. Seam vision and laser-tracker geometry confirmed the roof-to-sidewall joints inside the control-plan tolerance on the first four seams.

  5. 05 approve.human APPROVAL 52 s

    Plant Orchestrator · Sequence #6 lowers heat input on the roof joints 2% below the standing weld procedure. Heat-input changes stay with a named engineer, so the step was held for the shift weld engineer and approved at 06:12:44 with the twin evidence attached.

  6. 06 bogie.torque SUCCEEDED continuous

    Bogie-and-Running-Gear · Press-fit curves and torque traces on bogie B-14 read at the station. Two traction-motor mounting traces fell outside the expected profile and were routed to rework before brake test; the remaining safety-critical joints verified to spec.

  7. 07 coat.cure SUCCEEDED continuous

    Coat-and-Livery · Booth 2 humidity and temperature, film thickness and flash time watched through the livery pass. One masking misalignment on the door band flagged by booth vision before the second coat; the cure window held and handed to the sequence as a hard constraint.

  8. 08 marry.align SUCCEEDED 2 m 05 s

    Marry-and-Couple · Carbody and bogie scans compared against target interface geometry before the lift. Fit-out readiness confirmed by Fitout-and-Interior for doors and glazing. Marriage guided inside tolerance; coupler and gangway checks verified and written to the twin.

  9. 09 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Weld and coating vision, in-line metrology, torque, wiring continuity and brake-test results fused at the edge across the car. Every finding localised to station, work package and shift, with the two torque reworks and the masking flag already closed.

  10. 10 car.release SUCCEEDED 1 m 30 s

    Conformance · Car 07 released: genealogy written (weld records per joint, geometry scans, torque traces, coating recipe and cure record, fit-out checks, marriage interface, approvals, test results) and dispositioned against the control plan and IRIS / ISO/TS 22163 criteria with cited evidence for the quality engineer's sign-off.

Segments

Which plan fits

Locomotives, high-speed and intercity trainsets, metro and commuter cars, passenger coaches, freight wagons. Most plants pick one process and one wedge, prove the number, then expand.

LocomotivesHeavy structures, high value

Locomotives

Locomotive carbody and underframe shops with large welded structures and propulsion integration. Carbra on the shell line first, where weld rework and geometry escapes are already counted.

High-speed and intercity trainsetsGeometry and ride quality

High-speed and intercity trainsets

Aluminium extrusion shells, tight door-aperture tolerances and ride-quality acceptance. Carbra and Bogira together, with Fitura on the marriage station.

Metro, light rail and commuter carsVariants and cadence

Metro, light rail and commuter cars

Variant-rich, long-cycle lines where a missed bogie or cure window breaks delivery cadence. Taktos on the shift plan, Coatyx on the booth.

Passenger coachesFit-out and livery

Passenger coaches

Interior fit-out, accessibility requirements and class-A livery. Fitura on fit-out and Coatyx on livery, with the conformance record from day one.

Freight wagonsVolume and torque

Freight wagons

High-volume welded structures and running-gear assembly at rate. Carbra and Bogira where the torque and weld records already exist.

Guardrails

An agent that can change a weld sequence needs a leash

Railira writes to production systems. Every capability is scoped, every write is policy-checked against the approved control plan, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent acts only through an explicit tool allow-list, inside per-tool rate and magnitude limits and the approved control-plan envelope for the car type.
  • Policy engine before every write. Autonomy level, shift, car type, interlock state and operator presence are evaluated before a recommendation becomes a write to a robot, MES, torque tool or work package.
  • Human-in-the-loop gates. Heat-input and weld-sequence changes, schedule release and car release wait for a named approver. High-risk changes remain human-approved until IRIS, plant and OEM acceptance is earned.
  • Immutable audit log. Append-only and exportable. Every action records source evidence, the control-plan envelope, confidence, estimated quality and takt impact, rollback path, approver and car scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the robot, PLC or station's last known-good state. Safety systems and interlocks are never in Railira's path.
  • Tenant and program isolation. Designs, control plans, program data, models and memory never cross a customer boundary. On-prem and plant-edge deployment is available for regulated plants.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type I and OEM cyber reviewCloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
IRIS and regulatory assurance packagesDisposition and genealogy evidence QUEUED Planned, 6 to 12 months; not a certification claim
Standards-cited reasoningControl plans, EN 15085, IRIS / ISO/TS 22163, TSI, AAR, APTA, torque and brake-test procedures RUNNING In the design, every answer cites its source
Per-tenant and program isolationDesigns, control plans, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentRegulated plants RUNNING Design option

Read the security overview

Enterprise

Standardise autonomy across the network

One policy model, one audit trail, one benchmark across every process in every plant, with the carbody, coating, torque and takt models kept private to each site and program.

Talk to us Enterprise details

  • SSO and role-based access down to the tool level, planned for the 6 to 12 month release
  • Network-wide autonomy policy with per-site override and approval chains
  • Cross-plant benchmarking on first-time-through, rework, PPM, delivery risk and takt
  • On-prem and plant-edge deployment for regulated and OEM cyber-reviewed plants
  • Edge autonomy that survives control-plane loss by returning to the controller's last known-good state
  • Dedicated deployment engineer and quarterly model review per plant
FAQ

Straight answers

The questions plant directors, body and coating engineers and quality leads ask in the first meeting.

Only within an explicit tool allow-list with per-tool rate and magnitude limits, inside the approved control-plan envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Railira writes nothing. Heat-input and weld-sequence changes, schedule release and car release stay with a named approver.

Get started

Start with one process

Start with one carbody, bogie, coating, fit-out or sequencing process and one measurable baseline. A paid pilot on weld and geometry, torque assurance, livery defects or line sequencing shows the number before you commit further.