Products

Buy the step that hurts. Add the rest when it pays.

Railira ships as five products mapped to the plant, not to abstract capabilities. Carbra controls carbody welding and geometry, Bogira controls bogie and running-gear assembly, Coatyx controls livery and protective coatings, Fitura manages fit-out, marriage and the as-built train twin, and Taktos sequences the plant on takt. Start with one on the Process tier and expand as each proves its number.

5 productsPer-process licensingWhole-plant bundle

run_9b4e27 · agent graph · car 07 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.order ✓ SUCCEEDED 02 · line_logistics takt.sequence ✓ SUCCEEDED 03 · fitura twin.simulate ✓ SUCCEEDED 04 · weld_structure weld.sequence ✓ SUCCEEDED 05 · orchestrator approve.human ◆ APPROVAL 06 · bogie_gear bogie.torque ✓ SUCCEEDED 07 · coat_livery coat.cure ✓ SUCCEEDED 08 · marry_couple marry.align ✓ SUCCEEDED 09 · quality_anomaly inspect.fuse ✓ SUCCEEDED 10 · conformance car.release ✓ SUCCEEDED

Illustrative scenario: Car 07 of a 4-car metro consist · shell line B · bogie shop · booth 2 · marriage station, one car, one approval gate

The five

One stack, five products, one record

Carbra controls the shell: EN 15085 welding and millimetre geometry, the structure everything else fits to. Bogira assembles the running gear to torque, press-fit and ride-quality spec. Coatyx applies livery and protective coatings right the first pass. Fitura aligns carbody, bogie, interiors and systems and hosts the as-built train twin. Taktos sequences production, kits, AMRs, commissioning and tests on takt. Data flows Carbra to Bogira to Fitura to Taktos; Coatyx cure windows constrain Taktos; the twin lives in Fitura and is fed by all.

Carbra · weld and structure

Control carbody welding and millimetre geometry before shell defects reach final assembly.

Carbra is the carbody fabrication agent.

Bogira · bogie and running gear

Assemble bogies and running gear to torque, press-fit and ride-quality spec.

Bogira is the bogie-and-running-gear assembly agent.

Coatyx · coat and livery

Apply rail livery and protective coatings right the first pass.

Coatyx is the coat-and-livery agent for rolling-stock plants.

Fitura · train twin

Align carbody, bogie, interiors, systems and the as-built train twin.

Fitura is the fit-out, marriage and train-twin product.

Taktos · line and logistics

Sequence railcar production, JIS feeding, AMRs, commissioning and dynamic tests on takt.

Taktos is the line-and-logistics agent.

Carbra · product family colour #178A47

Carbra

Control carbody welding and millimetre geometry before shell defects reach final assembly.

The problem

Rail carbodies are huge welded structures, not small parts. Steel shells and aluminium extrusion bodies must meet EN 15085 weld quality, EN 12663 fatigue expectations, EN 15227 crashworthiness intent, door aperture tolerances, roof, sidewall and underframe geometry, and a livery-ready surface. A heat-input drift, fixture shift, missed seam, extrusion mismatch or framing build-up can move a shell out by millimetres and force days of rework later in fit-out or commissioning.

What Carbra does

Carbra is the carbody fabrication agent. It fuses robotic weld parameters, seam vision, thermal signatures, fixture data, laser trackers, point clouds and non-conformance history to predict weld defects and geometry drift in real time. It recommends weld sequence, clamping, rework priority and inspection coverage inside approved control-plan envelopes, while GPU FEA surrogates estimate EN 12663 fatigue and EN 15227 crash-load sensitivities before the shift.

Who it is for

Rolling-stock OEM carbody shops building locomotives, high-speed and intercity trainsets, metro and commuter cars, passenger coaches and freight wagons; contract carbody fabricators; welding-cell integrators and rail manufacturing-engineering teams.

Key features

  • EN 15085 weld-defect vision for seams, plugs, brackets and extrusion joints
  • Millimetre carbody alignment prediction from laser trackers, point clouds, fixtures and weld history
  • Weld-sequence and heat-input recommendations with human approval gates
  • H100 or HGX FEA surrogates for carbody fatigue and crashworthiness sensitivity
  • Feeds shell geometry and weld genealogy into Fitura, Taktos, Coatyx and the conformance record

NVIDIA stack

Named in the product brief as the design

Jetson Orin / ThorH100 / HGXDeepStream / MetropolisHoloscanTensorRTTritonNVIDIA AI EnterpriseNIM / NeMo

Planned

DGX for cross-program weld and geometry fine-tuning · plannedSupervised weld-sequence optimisation inside approved control plans · planned

Why it needs a GPU

Real-time weld vision plus large-structure point clouds and FEA surrogates make GPUs mandatory at the edge and at training scale. CPU-only cannot hold the seam-alert latency or train carbody-scale surrogates.

MVP scope and first metric

Shadow mode on one instrumented shell line: prove weld-defect and geometry-drift prediction against the shop's own rework and acceptance records, then graduate to supervised recommendations and bounded control inside approved rail work instructions. First metric: weld rework and geometry escapes on a named line.

Tier. Process tier, $16,000 per carbody line or area per month, expanding to Plant and Enterprise.

Open questions

  • Per-plant sensor coverage, OT access and acceptance-data availability vary
  • Cross-plant model transfer waits on customer IP and data agreements
Bogira · product family colour #178A47

Bogira

Assemble bogies and running gear to torque, press-fit and ride-quality spec.

The problem

A bogie is the rail vehicle's safety-critical running gear. Wheelset press-fit, axle boxes, primary and secondary suspension, brake rigging, traction motors, gearboxes, yaw dampers and torque-to-spec joints all affect ride quality, reliability and acceptance. Assembly drift may only appear during brake tests, dynamic ride-quality runs or warranty service.

What Bogira does

Bogira is the bogie-and-running-gear assembly agent. It ingests press-fit curves, torque traces, bearing data, motor and gearbox mounting telemetry, brake-system checks, machine vision and inspection records to detect assembly anomalies, predict ride and brake risk, and guide technicians through torque, shim, suspension and mounting decisions inside approved work instructions.

Who it is for

Rolling-stock OEM bogie shops, locomotive and metro truck builders, overhaul facilities, and manufacturing-engineering teams responsible for running gear, brakes, wheelsets, suspension and traction mounting.

Key features

  • Wheelset press-fit curve anomaly detection
  • Torque-trace analytics for safety-critical bogie joints
  • Suspension, brake, traction-motor and gearbox mounting verification
  • Vision inspection for missing parts, orientation, labels and harness routing on the bogie
  • Feeds ride-quality, brake and running-gear risk into Fitura and Taktos

NVIDIA stack

Named in the product brief as the design

Jetson Orin / ThorH100 / HGXHoloscanDeepStream / MetropolisTensorRTTritonNVIDIA AI EnterpriseNIM / NeMo

Planned

DGX for multi-plant running-gear model training · plannedRide-quality risk prediction from build data · planned

Why it needs a GPU

Multi-stream station vision and anomaly detection on high-volume torque and press-fit traces need edge GPUs; network learning across bogie corpora uses H100 or HGX.

MVP scope and first metric

Shadow mode on one instrumented bogie line: prove press-fit and torque anomaly detection against brake-test and inspection outcomes, then graduate to supervised guidance inside approved work instructions. First metric: press-fit and torque escapes caught before brake test.

Tier. Process tier, $16,000 per bogie line or area per month, expanding to Plant and Enterprise.

Open questions

  • Per-plant sensor coverage, OT access and acceptance-data availability vary
  • Cross-plant model transfer waits on customer IP and data agreements
Coatyx · product family colour #178A47

Coatyx

Apply rail livery and protective coatings right the first pass.

The problem

Rail exteriors must survive weather, ballast impact, washing chemicals, graffiti, corrosion, UV and customer livery standards. Surface prep, primer, film build, masking, cure windows and environmental conditions all interact. A coating defect can block delivery, force a repaint, delay commissioning or create lifecycle corrosion risk.

What Coatyx does

Coatyx is the coat-and-livery agent for rolling-stock plants. It fuses booth cameras, surface-prep data, thickness gauges, cure and flash telemetry, humidity and temperature, recipe history and visual inspection to predict runs, dirt, adhesion risk, colour or livery mismatch, corrosion-protection gaps and cure-window conflicts before they reach acceptance.

Who it is for

Rolling-stock OEM coating and livery shops, passenger coach, metro and transit railcar coating lines, freight-wagon coating lines, refurbishment facilities and livery suppliers.

Key features

  • Surface-prep, primer, livery, film-build and cure-window monitoring
  • Vision detection for dirt, runs, masking errors, colour breaks and livery alignment
  • Anti-graffiti and anti-corrosion coating conformance tracking
  • Flash and cure window constraints handed to Taktos
  • Coating genealogy tied to IRIS / ISO/TS 22163 and customer acceptance records

NVIDIA stack

Named in the product brief as the design

Jetson OrinDGX / HGXDeepStream / MetropolisTensorRTTritonHoloscanNVIDIA AI Enterprise

Planned

Cosmos and Omniverse Replicator for rare coating-defect synthesis · plannedOVX for coating-cell and airflow simulation in the plant twin · planned

Why it needs a GPU

High-resolution coating vision and rare-defect synthetic generation require GPU edge inference and GPU training. CPU-only cannot inspect a booth at line speed.

MVP scope and first metric

Shadow mode on one coating area: prove defect and cure-window prediction against the shop's repaint and acceptance records, then graduate to supervised recipe and routing recommendations. First metric: final-livery defects and repaint events on a named booth.

Tier. Process tier, $16,000 per coating area per month, expanding to Plant and Enterprise with outcome components on repaint and delivery delay.

Open questions

  • Per-plant sensor coverage, OT access and acceptance-data availability vary
  • Synthetic rare-defect fidelity must be validated against real distributions
Fitura · product family colour #178A47

Fitura

Align carbody, bogie, interiors, systems and the as-built train twin.

The problem

Final rolling-stock assembly couples enormous subsystems: carbody, bogies, couplers, gangways, doors, glazing, floors, seats, cab equipment, HVAC, pantograph or third-rail gear, batteries, wiring harnesses and accessibility interiors. Misalignment or late discovery creates rework, missed acceptance windows and delivery delay.

What Fitura does

Fitura is the fit-out, marriage and train-twin product. It hosts Railira's Omniverse as-built train-and-plant digital twin, consuming Carbra shell geometry, Bogira running-gear data, Coatyx coating state and underframe and propulsion telemetry. Fitura predicts fit, wiring, accessibility, door, glazing, interior, cab and carbody-to-bogie marriage risk before work starts and guides supervised corrections.

Who it is for

Rolling-stock final assembly plants, trainset integrators, metro and transit car builders, passenger coach plants, locomotive assembly teams and commissioning engineering groups.

Key features

  • Omniverse as-built train-and-plant digital twin
  • Carbody-to-bogie marriage, coupler and gangway alignment guidance
  • Interior fit-out validation for seats, panels, flooring, doors, glazing, cab and ADA/PRM requirements
  • Underframe propulsion, HVAC, pantograph or third-rail, battery, wiring routing and continuity risk prediction
  • Feeds readiness, rework and acceptance constraints into Taktos

NVIDIA stack

Named in the product brief as the design

DGX / OVXJetson Orin / ThorH100 / HGXOmniverseDeepStream / MetropolisTensorRTTritonNVIDIA AI EnterpriseNeMo / NIM

Planned

Twin-to-work-plan optimisation · planned

Why it needs a GPU

Large as-built train twins, point clouds, CAD matching, simulation and multi-camera inspection are GPU-heavy by design. CPU-only cannot keep the twin current with the line.

MVP scope and first metric

Shadow mode on one marriage or fit-out area: prove fit and interface risk prediction against rework records, then graduate to supervised alignment guidance and twin-ranked build plans. First metric: marriage rework and fit-out rework on a named area.

Tier. Process tier, $16,000 per final-assembly area per month, or the anchor of the $120,000 per month Plant tier.

Open questions

  • Per-plant sensor coverage, OT access and acceptance-data availability vary
  • Cross-plant model transfer waits on customer IP and data agreements
Taktos · product family colour #178A47

Taktos

Sequence railcar production, JIS feeding, AMRs, commissioning and dynamic tests on takt.

The problem

Rolling-stock plants run long-cycle, variant-rich production where one missing harness, curing carbody, late bogie, unavailable brake-test slot or dynamic-test conflict can break delivery cadence. Schedulers juggle JIS feeding, buffers, AMR and AGV moves, station skills, rework, commissioning and customer acceptance with limited real-time prediction.

What Taktos does

Taktos is the line-and-logistics agent. It uses cuOpt, plant telemetry, work-package status, AMR and AGV state, inventory, coating cure windows, rework risk and commissioning resources to sequence work, feed kits, manage buffers and schedule brake tests, traction tests, ETCS, ERTMS or PTC commissioning, dynamic ride-quality runs and haul tests.

Who it is for

Rolling-stock plant directors, production-control teams, industrial engineers, logistics managers, commissioning managers and multi-site manufacturing networks.

Key features

  • Line sequencing and takt-risk prediction for variant-rich rolling-stock builds
  • JIS kit feeding, AMR and AGV routing, buffer and constraint management
  • Coatyx flash and cure windows and Fitura train-twin readiness as constraints
  • Commissioning and dynamic-test scheduling for brake, traction, signaling, ride-quality and haul tests
  • Network analytics for first-time-through, PPM, delivery risk and capacity

NVIDIA stack

Named in the product brief as the design

H100 / HGXJetson Orin / ThorcuOptRAPIDSTritonNIMOmniverseNeMo

Planned

DGX or OVX for plant-twin scenario planning · plannedClosed-loop schedule auto-release with human gates · planned

Why it needs a GPU

Constrained optimisation over thousands of tasks, assets, variants, rework states and test slots is a GPU-native scheduling problem at network scale.

MVP scope and first metric

Shadow mode on one plant's sequencing: compare cuOpt plans against the released schedule and measure predicted takt risk against what happened, then graduate to recommended sequences the production-control team releases. First metric: line stoppage minutes and test-slot conflicts.

Tier. Process tier, $16,000 per month for line and logistics, often expanding to the $120,000 per month Plant tier and Enterprise network optimisation.

Open questions

  • Per-plant sensor coverage, OT access and acceptance-data availability vary
  • Closed-loop schedule release is planned, not built
Compare

What is in each tier

Products are licensed per process or line area on the Process tier and bundled on Plant and Enterprise.

What is in each tier
CapabilityProcessPlantEnterprise
Processes covered1All on siteAll in network
Agent modules1 of 5 productsAll agentsAll agents + custom models
Train-and-plant twin (Fitura)NoIncludedCustom program twins
Plant-edge nodeIncludedPer processFleet managed
Guarded writesScoped toolsAll scoped toolsNetwork policy
Car genealogyIncludedIncludedIncluded + assurance packets
Autonomy levelsL1 to L2L1 to L3L1 to L4 when accepted
SSO and RBACNoPlannedPlanned, with approval chains
On-prem deploymentNoOptionalIncluded
SupportBusiness hours24/724/7 + named engineer
Indicative price$16,000/mo$120,000/mo$1M to $15M ACV
Run timeline · scenario

The five products in one car

Every Railira run is an ordered, inspectable sequence. This is run_9b4e27: Car 07 of a 4-car metro consist · shell line B · bogie shop · booth 2 · marriage station. Scenario completes in 10 steps with one approval gate. Shell geometry held inside tolerance after a twin-ranked weld sequence, one heat-input change approved by the shift weld engineer, two torque traces routed to rework before brake test, the livery cure window protected in the sequence, marriage interface inside tolerance, car released with full genealogy.

run_9b4e27 car 07 · 4-car metro consist illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.8 s

    Plant Orchestrator · Pulled the work packages for car 07 from MES and PLM: aluminium extrusion shell, EN 15085 weld class per joint, control-plan geometry tolerances, bogie torque specifications, livery recipe and cure window, fit-out and marriage sequence. Locked the approved control-plan envelope for the shift.

  2. 02 takt.sequence SUCCEEDED 41 s

    Line-and-Logistics · Sequenced the shift against live readiness: booth 2 cure window, bogie B-14 readiness, brake-test slot at 13:40, AMR fleet state and kit inventory. The plan moves car 07 marriage behind car 06 to keep the cure window and the test slot.

  3. 03 twin.simulate SUCCEEDED 58 s

    Train Twin · Simulated 18 candidate weld sequences for the roof-to-sidewall joints on the as-built twin and ranked them on predicted distortion, door-aperture geometry and heat input. Sequence #6 keeps the aperture inside tolerance with 2% less heat input than the standing sequence.

  4. 04 weld.sequence SUCCEEDED 3 m 12 s

    Weld-and-Structure · Recommended sequence #6 and the matching clamping plan to the shell line. Seam vision and laser-tracker geometry confirmed the roof-to-sidewall joints inside the control-plan tolerance on the first four seams.

  5. 05 approve.human APPROVAL 52 s

    Plant Orchestrator · Sequence #6 lowers heat input on the roof joints 2% below the standing weld procedure. Heat-input changes stay with a named engineer, so the step was held for the shift weld engineer and approved at 06:12:44 with the twin evidence attached.

  6. 06 bogie.torque SUCCEEDED continuous

    Bogie-and-Running-Gear · Press-fit curves and torque traces on bogie B-14 read at the station. Two traction-motor mounting traces fell outside the expected profile and were routed to rework before brake test; the remaining safety-critical joints verified to spec.

  7. 07 coat.cure SUCCEEDED continuous

    Coat-and-Livery · Booth 2 humidity and temperature, film thickness and flash time watched through the livery pass. One masking misalignment on the door band flagged by booth vision before the second coat; the cure window held and handed to the sequence as a hard constraint.

  8. 08 marry.align SUCCEEDED 2 m 05 s

    Marry-and-Couple · Carbody and bogie scans compared against target interface geometry before the lift. Fit-out readiness confirmed by Fitout-and-Interior for doors and glazing. Marriage guided inside tolerance; coupler and gangway checks verified and written to the twin.

  9. 09 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Weld and coating vision, in-line metrology, torque, wiring continuity and brake-test results fused at the edge across the car. Every finding localised to station, work package and shift, with the two torque reworks and the masking flag already closed.

  10. 10 car.release SUCCEEDED 1 m 30 s

    Conformance · Car 07 released: genealogy written (weld records per joint, geometry scans, torque traces, coating recipe and cure record, fit-out checks, marriage interface, approvals, test results) and dispositioned against the control plan and IRIS / ISO/TS 22163 criteria with cited evidence for the quality engineer's sign-off.

Accelerated computing

Physical AI, at the station

A seam is welded in seconds and a booth cannot wait for the cloud. Perception has to be local, deterministic and fast, so Railira runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

8 to 32 cameras per process area plus metrology, torque, thermal, robot and booth-instrument streams fused at the plant edge. Sub-50 ms weld and seam alerts and sub-150 ms coating and metrology prompts are the design targets. Jetson Thor is planned for higher sensor density.

Triton · NIM

Model serving

Weld-defect, geometry-risk, coating-risk, point-cloud and takt-risk models served at the plant edge with per-model versioning and rollback, routed by latency, tenant, sensitivity and cost.

DGX or HGX · NeMo

Training

Weld and coating defect vision, metrology classification, control-plan reasoning and FEA-surrogate models fine-tuned on plant data and engineer corrections. 100 to 500 GPU-hours per plant during onboarding is the design target; dedicated capacity is planned.

Omniverse · OVX

Train-and-plant twin

As-built carbody, coating, marriage and line-flow twin. Weld distortion, geometry build-up, robot reach, coating coverage and layout simulated before the shift. GPU FEA and point-cloud metrology are the workloads; OVX scale is planned.

Cosmos · Omniverse Replicator

Synthetic data

Rare weld defects, coating contamination, geometry deviations, occluded seams and torque-escape cases generated and validated against real inspection distributions before promotion. Planned.

cuOpt

Optimisation

Line sequencing, JIS feeding, AMR and AGV routing, buffer management and commissioning-slot scheduling against live readiness.

Isaac · Isaac ROS

Robot cells

Robotic weld, coating and assembly cells and AMR or AGV flow; path variants validated in simulation before release to the floor.

RAPIDS

GPU ETL

Telemetry features from weld parameters, metrology, coating readings, torque, non-conformance and takt history for retraining, drift detection and network analytics.

Pricing

Priced per process, per plant, per network

Land on one workflow with a measured baseline. Expand by process, module and autonomy level. Outcome components are available on rework, line uptime, first-time-through and takt. Annual prepay carries a 15 to 20% discount.

Billing period
Process $16,000 per production process or line area / month · billed monthly

Carbody, coating or assembly autonomy or inspection AI for one process. For plants validating ROI on the wedge.

  • One process or line area, one agent module
  • Plant-edge inference node included
  • Controller and sensor reads, guarded recommendations
  • Run log, audit trail, car genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $1M to $15M ACV

Multi-plant OEM and tier-1 networks standardising on Railira, with custom carbody, coating, torque and takt models and a plant-edge fleet.

  • Multi-plant fleet management
  • Custom carbody, coating, torque and takt models
  • Plant-edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
FAQ

Straight answers

The questions plant directors, body and coating engineers and quality leads ask in the first meeting.

Only within an explicit tool allow-list with per-tool rate and magnitude limits, inside the approved control-plan envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Railira writes nothing. Heat-input and weld-sequence changes, schedule release and car release stay with a named approver.

Get started

Pick your first product

Start with one carbody, bogie, coating, fit-out or sequencing process and one measurable baseline. A paid pilot on weld and geometry, torque assurance, livery defects or line sequencing shows the number before you commit further.