Solutions

Start where the rework is.

Every rolling-stock plant already measures weld rework, repaint, torque escapes, line stoppage minutes and first-time-through. Railira lands on one of those numbers, on one process, with a baseline agreed in writing, and expands when it moves.

6 wedges1 process to startBaseline agreed in writing

run_9b4e27 · agent graph · car 07 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.order ✓ SUCCEEDED 02 · line_logistics takt.sequence ✓ SUCCEEDED 03 · fitura twin.simulate ✓ SUCCEEDED 04 · weld_structure weld.sequence ✓ SUCCEEDED 05 · orchestrator approve.human ◆ APPROVAL 06 · bogie_gear bogie.torque ✓ SUCCEEDED 07 · coat_livery coat.cure ✓ SUCCEEDED 08 · marry_couple marry.align ✓ SUCCEEDED 09 · quality_anomaly inspect.fuse ✓ SUCCEEDED 10 · conformance car.release ✓ SUCCEEDED

Illustrative scenario: Car 07 of a 4-car metro consist · shell line B · bogie shop · booth 2 · marriage station, one car, one approval gate

By outcome

Six wedges, each with a metric the plant already has

The first paid pilot targets one of these. The metric column is what the pilot would be judged on.

Weld and geometry

Carbody shell lines

Predict weld defects and geometry drift as the shell is built, rank weld sequences on the twin, hold door apertures inside tolerance. Metric: weld rework and geometry escapes against the body-shop baseline.

Carbraagent.weld_structure

Bogie and torque

Bogie and running-gear shops

Read press-fit curves and torque traces per joint, catch the escape before brake test, verify mounting and completeness by vision. Metric: press-fit and torque escapes caught before test.

Bogiraagent.bogie_gear

Livery and cure

Coating and livery booths

Flag dirt, runs, masking errors and colour breaks before the next coat and carry the cure window into the sequence. Metric: final-livery defects and repaint events against the coating-shop baseline.

Coatyxagent.coat_livery

Marriage and fit-out

Final assembly

Check interface geometry before the lift, confirm fit-out readiness, guide the marriage, write the as-built interface to the twin. Metric: marriage and fit-out rework against baseline.

Fituraagent.marry_couple

Sequencing and takt

Whole plant

Sequence variant-rich production against live readiness, feed kits just in sequence, route AMRs, schedule brake, traction, signaling, ride and haul tests. Metric: line stoppage minutes and test-slot conflicts.

Taktosagent.line_logistics

Readiness before the shift

Whole plant

Rehearse weld sequences, geometry strategies, coating coverage, marriage fit and build order on the as-built twin and discard candidates that breach tolerance or cure. Metric: first-time-through and delivery risk.

Fituratwin.fitura
Where it pays

Four loops, four metrics

Railira is not a dashboard. Each agent closes a loop a plant already measures in rework, repaint, torque escapes and line stoppage minutes. The tables show what each loop watches and what it is allowed to move.

Weld and geometry

Sequence the distortion out before the first seam

Weld parameters, seam vision, thermal signatures, fixture state and laser-tracker geometry are fused at the edge into one live estimate of weld quality and shell geometry. Carbra ranks weld sequences and clamping plans on the twin, recommends the one that holds the door aperture, and leaves heat-input changes to a named engineer.

  • Weld defects and geometry drift predicted while the shell is built, not found at fit-out
  • EN 15085 weld classes enforced per joint at call time
  • Every joint labelled with its downstream geometry and acceptance outcome
agent.weld_structure SUCCEEDED
Sequence the distortion out before the first seam: signals watched and moves made
SignalWatchesMoves
Weld qualitySeam cameras, weld current, thermalWeld sequence and clamping recommendations
Shell geometryLaser trackers, point cloudsRework priority, inspection coverage
Heat inputWeld parameters per jointUnder engineer approval only
Bogie and torque

Catch the torque escape before brake test

Press-fit curves, torque traces, bearing and mounting telemetry and station vision are read as the bogie is built. Bogira detects the trace that is out of profile, routes the joint to rework before the brake test and keeps the slot.

  • Press-fit and torque anomalies detected per joint, not sampled
  • Missing parts, orientation and harness routing checked by vision
  • Ride and brake risk predicted from build data
agent.bogie_gear SUCCEEDED
Catch the torque escape before brake test: signals watched and moves made
SignalWatchesMoves
Press-fitCurve per wheelsetStation hold, rework routing
TorqueTrace per safety-critical jointRework before brake test
CompletenessStation visionMissing-part and routing flags
Livery and cure

Protect the cure window in the sequence

Booth cameras, film thickness, humidity, temperature and flash time are watched through every pass. Coatyx flags dirt, runs, masking errors and colour breaks before the next coat, and hands the cure window to Taktos as a constraint the sequence cannot break.

  • Coating defects found before the next coat, not at acceptance
  • Film build and cure predicted from recipe and environment
  • Cure windows carried into the line plan
agent.coat_livery SUCCEEDED
Protect the cure window in the sequence: signals watched and moves made
SignalWatchesMoves
Surface and filmBooth cameras, thickness gaugesInspection and rework routing
EnvironmentHumidity, temperature, flash timeRecipe inside the approved spec
Cure windowCure telemetryConstraint to Line-and-Logistics
Marriage and takt

Marry on the first lift, on the planned slot

Carbody and bogie scans are compared against the target interface before the lift, fit-out readiness is confirmed, and the marriage is guided inside tolerance. Taktos has already sequenced the car so the bogie, the cure and the test slot line up.

  • Interface geometry checked before the lift, not after
  • Fit-out, coupler and gangway readiness confirmed in the same record
  • Sequence built on live readiness, not static routings
agent.marry_couple SUCCEEDED
Marry on the first lift, on the planned slot: signals watched and moves made
SignalWatchesMoves
Interface geometryCarbody and bogie point cloudsAlignment guidance, hold if out of tolerance
ReadinessFit-out, bogie, coating stateSequence and buffer plan
Test slotsBrake, traction, signaling, ride, haulCommissioning schedule
Segments

Where plants start

Locomotives, high-speed and intercity trainsets, metro and commuter cars, passenger coaches, freight wagons. Most plants pick one process and one wedge, prove the number, then expand.

LocomotivesHeavy structures, high value

Locomotives

Locomotive carbody and underframe shops with large welded structures and propulsion integration. Carbra on the shell line first, where weld rework and geometry escapes are already counted.

High-speed and intercity trainsetsGeometry and ride quality

High-speed and intercity trainsets

Aluminium extrusion shells, tight door-aperture tolerances and ride-quality acceptance. Carbra and Bogira together, with Fitura on the marriage station.

Metro, light rail and commuter carsVariants and cadence

Metro, light rail and commuter cars

Variant-rich, long-cycle lines where a missed bogie or cure window breaks delivery cadence. Taktos on the shift plan, Coatyx on the booth.

Passenger coachesFit-out and livery

Passenger coaches

Interior fit-out, accessibility requirements and class-A livery. Fitura on fit-out and Coatyx on livery, with the conformance record from day one.

Freight wagonsVolume and torque

Freight wagons

High-volume welded structures and running-gear assembly at rate. Carbra and Bogira where the torque and weld records already exist.

Run timeline · scenario

One scenario run, step by step

Every Railira run is an ordered, inspectable sequence. This is run_9b4e27: Car 07 of a 4-car metro consist · shell line B · bogie shop · booth 2 · marriage station. Scenario completes in 10 steps with one approval gate. Shell geometry held inside tolerance after a twin-ranked weld sequence, one heat-input change approved by the shift weld engineer, two torque traces routed to rework before brake test, the livery cure window protected in the sequence, marriage interface inside tolerance, car released with full genealogy.

run_9b4e27 car 07 · 4-car metro consist illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.8 s

    Plant Orchestrator · Pulled the work packages for car 07 from MES and PLM: aluminium extrusion shell, EN 15085 weld class per joint, control-plan geometry tolerances, bogie torque specifications, livery recipe and cure window, fit-out and marriage sequence. Locked the approved control-plan envelope for the shift.

  2. 02 takt.sequence SUCCEEDED 41 s

    Line-and-Logistics · Sequenced the shift against live readiness: booth 2 cure window, bogie B-14 readiness, brake-test slot at 13:40, AMR fleet state and kit inventory. The plan moves car 07 marriage behind car 06 to keep the cure window and the test slot.

  3. 03 twin.simulate SUCCEEDED 58 s

    Train Twin · Simulated 18 candidate weld sequences for the roof-to-sidewall joints on the as-built twin and ranked them on predicted distortion, door-aperture geometry and heat input. Sequence #6 keeps the aperture inside tolerance with 2% less heat input than the standing sequence.

  4. 04 weld.sequence SUCCEEDED 3 m 12 s

    Weld-and-Structure · Recommended sequence #6 and the matching clamping plan to the shell line. Seam vision and laser-tracker geometry confirmed the roof-to-sidewall joints inside the control-plan tolerance on the first four seams.

  5. 05 approve.human APPROVAL 52 s

    Plant Orchestrator · Sequence #6 lowers heat input on the roof joints 2% below the standing weld procedure. Heat-input changes stay with a named engineer, so the step was held for the shift weld engineer and approved at 06:12:44 with the twin evidence attached.

  6. 06 bogie.torque SUCCEEDED continuous

    Bogie-and-Running-Gear · Press-fit curves and torque traces on bogie B-14 read at the station. Two traction-motor mounting traces fell outside the expected profile and were routed to rework before brake test; the remaining safety-critical joints verified to spec.

  7. 07 coat.cure SUCCEEDED continuous

    Coat-and-Livery · Booth 2 humidity and temperature, film thickness and flash time watched through the livery pass. One masking misalignment on the door band flagged by booth vision before the second coat; the cure window held and handed to the sequence as a hard constraint.

  8. 08 marry.align SUCCEEDED 2 m 05 s

    Marry-and-Couple · Carbody and bogie scans compared against target interface geometry before the lift. Fit-out readiness confirmed by Fitout-and-Interior for doors and glazing. Marriage guided inside tolerance; coupler and gangway checks verified and written to the twin.

  9. 09 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Weld and coating vision, in-line metrology, torque, wiring continuity and brake-test results fused at the edge across the car. Every finding localised to station, work package and shift, with the two torque reworks and the masking flag already closed.

  10. 10 car.release SUCCEEDED 1 m 30 s

    Conformance · Car 07 released: genealogy written (weld records per joint, geometry scans, torque traces, coating recipe and cure record, fit-out checks, marriage interface, approvals, test results) and dispositioned against the control plan and IRIS / ISO/TS 22163 criteria with cited evidence for the quality engineer's sign-off.

Who it is for

Built for the people who run the plant

We have no customer quotes to show yet and will not invent any. These are the three roles in a rolling-stock plant we build for, and the problems they bring to the first meeting.

Plant or Manufacturing Director

Owns launch dates, takt, line uptime, rework and cost.

What this person is dealing with today

  • Periodic audits, offline metrology and sampled inspection that let geometry, weld, coating and torque quality drift
  • Line stoppages and takt loss cascading across the build schedule
  • A severe skilled-operator and quality-engineer shortage that cannot staff the launch cadence

Body, Livery or Manufacturing-Engineering Lead

Owns joining and coating processes, carbody geometry strategy, robot programming and process capability.

What this person is dealing with today

  • Carbody shell distortion and fixture drift driving weld-defect scrap and downstream geometry problems
  • Geometry build-up and alignment error costing rework, door and glazing leaks and ride quality
  • Coating contamination, runs and film-thickness faults driving repaint and class-A livery rejects

Quality, STA or Compliance Lead

Owns weld, coating, geometry and torque quality, non-conformance, PPAP, and IRIS / ISO/TS 22163 and TSI, AAR, APTA traceability.

What this person is dealing with today

  • Marriage and coupling misalignment and torque escapes creating safety-critical rework and recall risk
  • Traceability for IRIS and PPAP audits assembled by hand after the fact
  • Carbody fabrication, bogie assembly, coating, fit-out and systems integration siloed and reactive
Autonomy

Four levels, set per agent and per tool

A rolling-stock plant does not go from manual to unattended in one step. Railira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk actions. Weld parameters, schedule release and car release stay with named humans until acceptance is earned.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · ShadowReads weld, metrology, torque, coating, wiring, test, robot and MES signals; predicts and recommends; writes nothingRuns the line as today; compares predictions to inspection and engineer outcomesShadow mode; baseline measured from the plant's own records
L2 · AssistProposes weld-sequence, geometry, coating, torque and sequencing moves with evidence, confidence, envelope and rollback pathApproves each move in the review consoleAssist mode; accuracy and ROI proven against the baseline
L3 · BoundedExecutes pre-approved low-risk actions: inspection routing, rework priority, kit feeding, robot path variants and parameter adjustments inside approved boundsApproves heat-input and weld-sequence changes, schedule release and car releaseGraduated autonomy, after audited accuracy and ROI and safety gates
L4 · ScaledSupervised weld-parameter adaptation inside pre-approved control-plan envelopes, across lines and plantsSets the envelope; reviews the shift record and the evaluation resultsPlanned; after IRIS, plant and OEM acceptance is earned
Pricing

Priced per process, per plant, per network

Land on one workflow with a measured baseline. Expand by process, module and autonomy level. Outcome components are available on rework, line uptime, first-time-through and takt. Annual prepay carries a 15 to 20% discount.

Billing period
Process $16,000 per production process or line area / month · billed monthly

Carbody, coating or assembly autonomy or inspection AI for one process. For plants validating ROI on the wedge.

  • One process or line area, one agent module
  • Plant-edge inference node included
  • Controller and sensor reads, guarded recommendations
  • Run log, audit trail, car genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $1M to $15M ACV

Multi-plant OEM and tier-1 networks standardising on Railira, with custom carbody, coating, torque and takt models and a plant-edge fleet.

  • Multi-plant fleet management
  • Custom carbody, coating, torque and takt models
  • Plant-edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
FAQ

Straight answers

The questions plant directors, body and coating engineers and quality leads ask in the first meeting.

Only within an explicit tool allow-list with per-tool rate and magnitude limits, inside the approved control-plan envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Railira writes nothing. Heat-input and weld-sequence changes, schedule release and car release stay with a named approver.

Get started

Name the process that costs you the most

Start with one carbody, bogie, coating, fit-out or sequencing process and one measurable baseline. A paid pilot on weld and geometry, torque assurance, livery defects or line sequencing shows the number before you commit further.