Security

How a piece of software is allowed to touch a line.

Railira writes to production systems, so the security story is mostly a control story: a bounded action space, a policy engine before every write, named approvers, an append-only audit log the plant owns, hard fallback to the controller and its interlocks, and isolation between tenants and their programs.

Policy before every writeAppend-only auditProgram isolation

Every agent action records
  • Source evidence it acted on
  • Control plans, work instructions and standards it retrieved, with citations
  • The approved control-plan envelope and the limit applied
  • Confidence and estimated quality and takt impact
  • Rollback path
  • Responsible approver
  • Car and work-package scope

Nothing is written without this record.

Guardrails

An agent that can change a weld sequence needs a leash

Railira writes to production systems. Every capability is scoped, every write is policy-checked against the approved control plan, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent acts only through an explicit tool allow-list, inside per-tool rate and magnitude limits and the approved control-plan envelope for the car type.
  • Policy engine before every write. Autonomy level, shift, car type, interlock state and operator presence are evaluated before a recommendation becomes a write to a robot, MES, torque tool or work package.
  • Human-in-the-loop gates. Heat-input and weld-sequence changes, schedule release and car release wait for a named approver. High-risk changes remain human-approved until IRIS, plant and OEM acceptance is earned.
  • Immutable audit log. Append-only and exportable. Every action records source evidence, the control-plan envelope, confidence, estimated quality and takt impact, rollback path, approver and car scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the robot, PLC or station's last known-good state. Safety systems and interlocks are never in Railira's path.
  • Tenant and program isolation. Designs, control plans, program data, models and memory never cross a customer boundary. On-prem and plant-edge deployment is available for regulated plants.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type I and OEM cyber reviewCloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
IRIS and regulatory assurance packagesDisposition and genealogy evidence QUEUED Planned, 6 to 12 months; not a certification claim
Standards-cited reasoningControl plans, EN 15085, IRIS / ISO/TS 22163, TSI, AAR, APTA, torque and brake-test procedures RUNNING In the design, every answer cites its source
Per-tenant and program isolationDesigns, control plans, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentRegulated plants RUNNING Design option

Read the security overview

Data

What data exists and who can see it

The data strategy from the architecture: car- and work-package-based, labelled from the floor, synthetic only for rare events, governed per tenant.

Sources

  • Weld and seam video, robot parameters, control plans and PPAP, material properties and panel geometry
  • Metrology scans and carbody measurements, torque telemetry, wiring continuity, brake-test and signaling results
  • Coating environmental readings, film-thickness measurements, recipe history
  • Line-balance and sequencing data, car genealogy, non-conformance reports, warranty and recall signals, operator approvals

Governance

  • Tenant isolation for designs, control plans, program data, models and memory
  • OEM cyber-aware controls, model lineage and action replay
  • Exportable IRIS and regulatory evidence
  • Traceable consent before any cross-plant learning, which is planned and not yet in place
  • Synthetic data used only to augment rare events, validated against real distributions
OT safety

The write path

What has to be true before a recommendation becomes a write.

  1. A declared tool. The agent can only call tools declared with targets, units, limits and a control-plan envelope.
  2. A policy decision. Autonomy level, shift, car type, interlock state and operator presence are evaluated.
  3. A simulated check. Where the agent is configured with verify=twin, the move is simulated before it is written.
  4. An approval, if required. Heat-input and weld-sequence changes, schedule release and car release wait for the named approver.
  5. A bounded write. The connector enforces per-tool rate and magnitude limits again at the OT boundary. Safety systems and interlocks are never in Railira's path.
  6. A record. The action, its evidence and its outcome are appended to the audit log and the car genealogy.
  7. A rollback path. Declared rollback conditions return the target to its previous value or the controller to last known-good.
Autonomy

Four levels, set per agent and per tool

A rolling-stock plant does not go from manual to unattended in one step. Railira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk actions. Weld parameters, schedule release and car release stay with named humans until acceptance is earned.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · ShadowReads weld, metrology, torque, coating, wiring, test, robot and MES signals; predicts and recommends; writes nothingRuns the line as today; compares predictions to inspection and engineer outcomesShadow mode; baseline measured from the plant's own records
L2 · AssistProposes weld-sequence, geometry, coating, torque and sequencing moves with evidence, confidence, envelope and rollback pathApproves each move in the review consoleAssist mode; accuracy and ROI proven against the baseline
L3 · BoundedExecutes pre-approved low-risk actions: inspection routing, rework priority, kit feeding, robot path variants and parameter adjustments inside approved boundsApproves heat-input and weld-sequence changes, schedule release and car releaseGraduated autonomy, after audited accuracy and ROI and safety gates
L4 · ScaledSupervised weld-parameter adaptation inside pre-approved control-plan envelopes, across lines and plantsSets the envelope; reviews the shift record and the evaluation resultsPlanned; after IRIS, plant and OEM acceptance is earned
Run timeline · scenario

One scenario run, step by step

Every Railira run is an ordered, inspectable sequence. This is run_9b4e27: Car 07 of a 4-car metro consist · shell line B · bogie shop · booth 2 · marriage station. Scenario completes in 10 steps with one approval gate. Shell geometry held inside tolerance after a twin-ranked weld sequence, one heat-input change approved by the shift weld engineer, two torque traces routed to rework before brake test, the livery cure window protected in the sequence, marriage interface inside tolerance, car released with full genealogy.

run_9b4e27 car 07 · 4-car metro consist illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.8 s

    Plant Orchestrator · Pulled the work packages for car 07 from MES and PLM: aluminium extrusion shell, EN 15085 weld class per joint, control-plan geometry tolerances, bogie torque specifications, livery recipe and cure window, fit-out and marriage sequence. Locked the approved control-plan envelope for the shift.

  2. 02 takt.sequence SUCCEEDED 41 s

    Line-and-Logistics · Sequenced the shift against live readiness: booth 2 cure window, bogie B-14 readiness, brake-test slot at 13:40, AMR fleet state and kit inventory. The plan moves car 07 marriage behind car 06 to keep the cure window and the test slot.

  3. 03 twin.simulate SUCCEEDED 58 s

    Train Twin · Simulated 18 candidate weld sequences for the roof-to-sidewall joints on the as-built twin and ranked them on predicted distortion, door-aperture geometry and heat input. Sequence #6 keeps the aperture inside tolerance with 2% less heat input than the standing sequence.

  4. 04 weld.sequence SUCCEEDED 3 m 12 s

    Weld-and-Structure · Recommended sequence #6 and the matching clamping plan to the shell line. Seam vision and laser-tracker geometry confirmed the roof-to-sidewall joints inside the control-plan tolerance on the first four seams.

  5. 05 approve.human APPROVAL 52 s

    Plant Orchestrator · Sequence #6 lowers heat input on the roof joints 2% below the standing weld procedure. Heat-input changes stay with a named engineer, so the step was held for the shift weld engineer and approved at 06:12:44 with the twin evidence attached.

  6. 06 bogie.torque SUCCEEDED continuous

    Bogie-and-Running-Gear · Press-fit curves and torque traces on bogie B-14 read at the station. Two traction-motor mounting traces fell outside the expected profile and were routed to rework before brake test; the remaining safety-critical joints verified to spec.

  7. 07 coat.cure SUCCEEDED continuous

    Coat-and-Livery · Booth 2 humidity and temperature, film thickness and flash time watched through the livery pass. One masking misalignment on the door band flagged by booth vision before the second coat; the cure window held and handed to the sequence as a hard constraint.

  8. 08 marry.align SUCCEEDED 2 m 05 s

    Marry-and-Couple · Carbody and bogie scans compared against target interface geometry before the lift. Fit-out readiness confirmed by Fitout-and-Interior for doors and glazing. Marriage guided inside tolerance; coupler and gangway checks verified and written to the twin.

  9. 09 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Weld and coating vision, in-line metrology, torque, wiring continuity and brake-test results fused at the edge across the car. Every finding localised to station, work package and shift, with the two torque reworks and the masking flag already closed.

  10. 10 car.release SUCCEEDED 1 m 30 s

    Conformance · Car 07 released: genealogy written (weld records per joint, geometry scans, torque traces, coating recipe and cure record, fit-out checks, marriage interface, approvals, test results) and dispositioned against the control plan and IRIS / ISO/TS 22163 criteria with cited evidence for the quality engineer's sign-off.

Tool calls · scenario

What the audit log looks like

Every tool invocation, argument and result is written to an append-only, human-readable log, and every reasoning step is expandable. Nothing about a run is hidden from the plant.

tool-call stream · run_9b4e27
  1. 05:58:02mes.read_workpackages({ car: "07", consist: "M4-118", shift: "A" })
  2. 05:58:03ok 142 work packages · control plan locked · EN 15085 classes mapped
  3. 05:58:04cuopt.sequence({ shift: "A", constraints: ["cure_window", "test_slot", "bogie_ready"] })
  4. 05:58:45ok plan released · car 07 marriage after car 06 · test slot 13:40 held
  5. 05:58:46twin.simulate({ joints: "roof-sidewall", candidates: 18 })
  6. 05:59:44ok best sequence #6 · aperture dev 0.6 mm · heat input −2%
  7. 05:59:45policy.evaluate({ sequence: 6, autonomy: "L2+" })
  8. 05:59:45ok 6 recommendations permitted · heat_input requires human approval
  9. 05:59:46weld.set_sequence({ line: "B", seq: 6, clamping: "plan-6" })
  10. 06:02:58ok 4 seams inside tolerance · tracker dev 0.5 mm
  11. 06:02:59approval.request({ action: "heat_input", delta: "-2%", joints: "roof" })
  12. 06:12:44ok approved by shift weld engineer · twin evidence attached · logged
  13. 06:12:45torque.read_trace({ bogie: "B-14", joints: "all" })
  14. 07:40:12trace out of profile · traction-motor mount M3, M4 · bogie B-14
  15. 07:40:13rework.route({ bogie: "B-14", joints: ["M3", "M4"], before: "brake_test" })
  16. 07:40:13ok routed · brake test slot held
  17. 08:05:00cure.window({ booth: 2, recipe: "livery-M4" })
  18. 08:31:20masking misalignment · door band · booth 2 · before coat 2
  19. 08:31:21ok masking corrected · cure window held · constraint sent to sequence
  20. 11:10:02scan.compare({ car: "07", bogie: "B-14" })
  21. 11:12:07ok interface inside tolerance · fit-out ready · marriage guided
  22. 11:12:08sensors.fuse({ car: "07", streams: ["vision", "metrology", "torque", "wiring"] })
  23. 13:58:40genealogy.write({ car: "07", packets: "full" })
  24. 14:00:10ok scenario complete · 10 steps · car 07 released

Reasoning trace

Plan, thought, action, observation, exactly as the orchestrator would record it.

GoalBuild car 07 through shell welding, bogie assembly, livery, fi…

Build car 07 through shell welding, bogie assembly, livery, fit-out and marriage on the shift plan, inside the control plan, with every safety-critical joint to spec and the cure window protected.

PlanSequence the shift first, so the cure window and the brake-tes…

Sequence the shift first, so the cure window and the brake-test slot are protected. Simulate the roof-to-sidewall weld sequence on the twin before the first seam. Read every torque trace at the station. Fuse inspection continuously. Hold any heat-input change for a human.

ThoughtThe standing weld procedure runs the roof joints hot enough to…

The standing weld procedure runs the roof joints hot enough to guarantee penetration on a cold fixture. With the clamping plan from the twin the same penetration holds at 2% less heat input and the door aperture stays inside tolerance, because the distortion is sequenced out rather than reworked out.

Actiontwin.simulate(candidates=18) returns sequence #6: roof joints …

twin.simulate(candidates=18) returns sequence #6: roof joints re-ordered, clamping plan 6, heat input down 2% on the roof joints.

ObservationSequence #6 predicts door-aperture deviation 0.6 mm against a …

Sequence #6 predicts door-aperture deviation 0.6 mm against a 1.5 mm tolerance. Three candidates scored lower on heat input but pushed predicted sidewall distortion past the limit and were discarded.

ActionRecommend sequence #6 to the shell line; six recommendations p…

Recommend sequence #6 to the shell line; six recommendations permitted; the heat-input change routed to the shift weld engineer with the twin evidence.

ObservationTwo traction-motor mounting traces on bogie B-14 fell outside …

Two traction-motor mounting traces on bogie B-14 fell outside the expected profile at 07:40:12. Routed to rework before brake test; the slot held. One masking misalignment on the door band flagged in booth 2 before the second coat.

OutcomeScenario complete. Shell inside tolerance, bogie joints to spe…

Scenario complete. Shell inside tolerance, bogie joints to spec after rework, livery inside the cure window, marriage interface inside tolerance. Car 07 released with full genealogy.

Enterprise

Standardise autonomy across the network

One policy model, one audit trail, one benchmark across every process in every plant, with the carbody, coating, torque and takt models kept private to each site and program.

Talk to us Enterprise details

  • SSO and role-based access down to the tool level, planned for the 6 to 12 month release
  • Network-wide autonomy policy with per-site override and approval chains
  • Cross-plant benchmarking on first-time-through, rework, PPM, delivery risk and takt
  • On-prem and plant-edge deployment for regulated and OEM cyber-reviewed plants
  • Edge autonomy that survives control-plane loss by returning to the controller's last known-good state
  • Dedicated deployment engineer and quarterly model review per plant
FAQ

Straight answers

The questions plant directors, body and coating engineers and quality leads ask in the first meeting.

Only within an explicit tool allow-list with per-tool rate and magnitude limits, inside the approved control-plan envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Railira writes nothing. Heat-input and weld-sequence changes, schedule release and car release stay with a named approver.