Integrations

It reads your plant. It does not replace it.

Railira connects to the PLM, MES, welding and coating robots, laser trackers and scanners, torque tools, wiring testers, brake-test rigs, commissioning systems, coating booths and AMR fleets already in a rolling-stock plant and normalises their signals into one time-aligned car and work-package record. Writes go back through the same systems, guarded.

11 system categoriesReads and guarded writesConfirmed per site

run_9b4e27 · agent graph · car 07 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.order ✓ SUCCEEDED 02 · line_logistics takt.sequence ✓ SUCCEEDED 03 · fitura twin.simulate ✓ SUCCEEDED 04 · weld_structure weld.sequence ✓ SUCCEEDED 05 · orchestrator approve.human ◆ APPROVAL 06 · bogie_gear bogie.torque ✓ SUCCEEDED 07 · coat_livery coat.cure ✓ SUCCEEDED 08 · marry_couple marry.align ✓ SUCCEEDED 09 · quality_anomaly inspect.fuse ✓ SUCCEEDED 10 · conformance car.release ✓ SUCCEEDED

Illustrative scenario: Car 07 of a 4-car metro consist · shell line B · bogie shop · booth 2 · marriage station, one car, one approval gate

Integrations

It speaks plant, not cloud

Railira reads and writes through the systems already on the floor. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found in rolling-stock plants, not certified integrations; connector availability is confirmed per site.

PLM, MES and line sequencing

Rail PLM, MES and sequencing suites (Siemens Teamcenter, Opcenter and Tecnomatix, Dassault DELMIA, Rockwell, iBASEt, Critical Manufacturing class systems)

Work packages, control plans, sequence reads; genealogy and schedule write-back

Welding and coating robots

Robot controllers and process controllers (FANUC, KUKA, ABB, Yaskawa, Comau, Dürr, Kawasaki class systems)

Parameter and path reads; bounded parameter and sequence recommendations

In-line metrology

Laser trackers, point-cloud scanners and vision systems (Hexagon, Zeiss, FARO, Cognex, ISRA Vision, Perceptron class systems)

Geometry scans and inspection results per car

Torque and error-proofing

Torque tools and controllers (Atlas Copco, Bosch Rexroth, Stanley class systems)

Torque traces per joint, rework routing

Wiring, brake and commissioning

Wiring testers, brake-test rigs, traction-test and ETCS, ERTMS or PTC commissioning systems

Continuity, brake and signaling results per car

Coating booths

Booth instruments, thickness gauges, environmental sensors, recipe systems

Film build, flash, cure, humidity and temperature

Plant simulation

Plant-simulation and twin tools (Siemens Tecnomatix Plant Simulation, Dassault DELMIA, Visual Components)

Model and result exchange with the train-and-plant twin

AMR and AGV fleets

Fleet managers and dispatch APIs

Fleet state, dispatch recommendations

Quality and QMS

Quality systems, PPAP and non-conformance records

Disposition, genealogy, acceptance evidence

Historian and stores

Time-series store for telemetry, pgvector for defect and scan images, control plans and standards

Backfill, replay, retrieval

Edge

NVIDIA Jetson Orin at the station, on-prem GPU in the plant

Inference where the car is built

See all integrations

Compatibility

Systems and what we do with them

Vendor names are examples of the systems found in rolling-stock plants, not certified integrations. Connector availability is confirmed during the shadow-mode phase of a pilot.

Systems and what Railira does with them
CategoryExamples in the plantWhat Railira does
PLM, MES and line sequencingRail PLM, MES and sequencing suites (Siemens Teamcenter, Opcenter and Tecnomatix, Dassault DELMIA, Rockwell, iBASEt, Critical Manufacturing class systems)Work packages, control plans, sequence reads; genealogy and schedule write-back
Welding and coating robotsRobot controllers and process controllers (FANUC, KUKA, ABB, Yaskawa, Comau, Dürr, Kawasaki class systems)Parameter and path reads; bounded parameter and sequence recommendations
In-line metrologyLaser trackers, point-cloud scanners and vision systems (Hexagon, Zeiss, FARO, Cognex, ISRA Vision, Perceptron class systems)Geometry scans and inspection results per car
Torque and error-proofingTorque tools and controllers (Atlas Copco, Bosch Rexroth, Stanley class systems)Torque traces per joint, rework routing
Wiring, brake and commissioningWiring testers, brake-test rigs, traction-test and ETCS, ERTMS or PTC commissioning systemsContinuity, brake and signaling results per car
Coating boothsBooth instruments, thickness gauges, environmental sensors, recipe systemsFilm build, flash, cure, humidity and temperature
Plant simulationPlant-simulation and twin tools (Siemens Tecnomatix Plant Simulation, Dassault DELMIA, Visual Components)Model and result exchange with the train-and-plant twin
AMR and AGV fleetsFleet managers and dispatch APIsFleet state, dispatch recommendations
Quality and QMSQuality systems, PPAP and non-conformance recordsDisposition, genealogy, acceptance evidence
Historian and storesTime-series store for telemetry, pgvector for defect and scan images, control plans and standardsBackfill, replay, retrieval
EdgeNVIDIA Jetson Orin at the station, on-prem GPU in the plantInference where the car is built
Connection

How a process gets connected

The shadow-mode phase of a pilot.

  1. Inventory. List the PLM, MES, robot, metrology, torque, test, booth and AMR systems on the wedge process, with their interfaces.
  2. Read-only first. Connect every source read-only and build the time-aligned car and work-package record. No writes exist yet.
  3. Baseline. Measure the agreed metric from the plant's own records.
  4. Declare the tools and the envelope. Agree the tool allow-list, limits, control-plan envelope and approvers before any write is enabled.
  5. Assist, then bounded. Writes begin on approval, then inside limits for low-risk actions, as the autonomy level is raised. Weld parameters stay with the engineer.
Boundaries

What Railira deliberately does not do

Scope limits in version one.

  • Replace the PLC, robot controller, safety system or interlocks. Railira is a supervisory layer on top of them.
  • Write to any target that is not on the allow-list, or outside its declared limits and envelope.
  • Change a weld procedure or heat input without a named engineer's approval.
  • Run full multi-process autonomy across the whole plant or network in version one.
  • Build long-tail integrations beyond the design partners' stacks before they are needed.
  • Move designs, control plans or program data across tenants.
Run timeline · scenario

One scenario run, step by step

Every Railira run is an ordered, inspectable sequence. This is run_9b4e27: Car 07 of a 4-car metro consist · shell line B · bogie shop · booth 2 · marriage station. Scenario completes in 10 steps with one approval gate. Shell geometry held inside tolerance after a twin-ranked weld sequence, one heat-input change approved by the shift weld engineer, two torque traces routed to rework before brake test, the livery cure window protected in the sequence, marriage interface inside tolerance, car released with full genealogy.

run_9b4e27 car 07 · 4-car metro consist illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.8 s

    Plant Orchestrator · Pulled the work packages for car 07 from MES and PLM: aluminium extrusion shell, EN 15085 weld class per joint, control-plan geometry tolerances, bogie torque specifications, livery recipe and cure window, fit-out and marriage sequence. Locked the approved control-plan envelope for the shift.

  2. 02 takt.sequence SUCCEEDED 41 s

    Line-and-Logistics · Sequenced the shift against live readiness: booth 2 cure window, bogie B-14 readiness, brake-test slot at 13:40, AMR fleet state and kit inventory. The plan moves car 07 marriage behind car 06 to keep the cure window and the test slot.

  3. 03 twin.simulate SUCCEEDED 58 s

    Train Twin · Simulated 18 candidate weld sequences for the roof-to-sidewall joints on the as-built twin and ranked them on predicted distortion, door-aperture geometry and heat input. Sequence #6 keeps the aperture inside tolerance with 2% less heat input than the standing sequence.

  4. 04 weld.sequence SUCCEEDED 3 m 12 s

    Weld-and-Structure · Recommended sequence #6 and the matching clamping plan to the shell line. Seam vision and laser-tracker geometry confirmed the roof-to-sidewall joints inside the control-plan tolerance on the first four seams.

  5. 05 approve.human APPROVAL 52 s

    Plant Orchestrator · Sequence #6 lowers heat input on the roof joints 2% below the standing weld procedure. Heat-input changes stay with a named engineer, so the step was held for the shift weld engineer and approved at 06:12:44 with the twin evidence attached.

  6. 06 bogie.torque SUCCEEDED continuous

    Bogie-and-Running-Gear · Press-fit curves and torque traces on bogie B-14 read at the station. Two traction-motor mounting traces fell outside the expected profile and were routed to rework before brake test; the remaining safety-critical joints verified to spec.

  7. 07 coat.cure SUCCEEDED continuous

    Coat-and-Livery · Booth 2 humidity and temperature, film thickness and flash time watched through the livery pass. One masking misalignment on the door band flagged by booth vision before the second coat; the cure window held and handed to the sequence as a hard constraint.

  8. 08 marry.align SUCCEEDED 2 m 05 s

    Marry-and-Couple · Carbody and bogie scans compared against target interface geometry before the lift. Fit-out readiness confirmed by Fitout-and-Interior for doors and glazing. Marriage guided inside tolerance; coupler and gangway checks verified and written to the twin.

  9. 09 inspect.fuse SUCCEEDED continuous

    Quality-and-Anomaly · Weld and coating vision, in-line metrology, torque, wiring continuity and brake-test results fused at the edge across the car. Every finding localised to station, work package and shift, with the two torque reworks and the masking flag already closed.

  10. 10 car.release SUCCEEDED 1 m 30 s

    Conformance · Car 07 released: genealogy written (weld records per joint, geometry scans, torque traces, coating recipe and cure record, fit-out checks, marriage interface, approvals, test results) and dispositioned against the control plan and IRIS / ISO/TS 22163 criteria with cited evidence for the quality engineer's sign-off.

Tool calls · scenario

The agent shows its work

Every tool invocation, argument and result is written to an append-only, human-readable log, and every reasoning step is expandable. Nothing about a run is hidden from the plant.

tool-call stream · run_9b4e27
  1. 05:58:02mes.read_workpackages({ car: "07", consist: "M4-118", shift: "A" })
  2. 05:58:03ok 142 work packages · control plan locked · EN 15085 classes mapped
  3. 05:58:04cuopt.sequence({ shift: "A", constraints: ["cure_window", "test_slot", "bogie_ready"] })
  4. 05:58:45ok plan released · car 07 marriage after car 06 · test slot 13:40 held
  5. 05:58:46twin.simulate({ joints: "roof-sidewall", candidates: 18 })
  6. 05:59:44ok best sequence #6 · aperture dev 0.6 mm · heat input −2%
  7. 05:59:45policy.evaluate({ sequence: 6, autonomy: "L2+" })
  8. 05:59:45ok 6 recommendations permitted · heat_input requires human approval
  9. 05:59:46weld.set_sequence({ line: "B", seq: 6, clamping: "plan-6" })
  10. 06:02:58ok 4 seams inside tolerance · tracker dev 0.5 mm
  11. 06:02:59approval.request({ action: "heat_input", delta: "-2%", joints: "roof" })
  12. 06:12:44ok approved by shift weld engineer · twin evidence attached · logged
  13. 06:12:45torque.read_trace({ bogie: "B-14", joints: "all" })
  14. 07:40:12trace out of profile · traction-motor mount M3, M4 · bogie B-14
  15. 07:40:13rework.route({ bogie: "B-14", joints: ["M3", "M4"], before: "brake_test" })
  16. 07:40:13ok routed · brake test slot held
  17. 08:05:00cure.window({ booth: 2, recipe: "livery-M4" })
  18. 08:31:20masking misalignment · door band · booth 2 · before coat 2
  19. 08:31:21ok masking corrected · cure window held · constraint sent to sequence
  20. 11:10:02scan.compare({ car: "07", bogie: "B-14" })
  21. 11:12:07ok interface inside tolerance · fit-out ready · marriage guided
  22. 11:12:08sensors.fuse({ car: "07", streams: ["vision", "metrology", "torque", "wiring"] })
  23. 13:58:40genealogy.write({ car: "07", packets: "full" })
  24. 14:00:10ok scenario complete · 10 steps · car 07 released

Reasoning trace

Plan, thought, action, observation, exactly as the orchestrator would record it.

GoalBuild car 07 through shell welding, bogie assembly, livery, fi…

Build car 07 through shell welding, bogie assembly, livery, fit-out and marriage on the shift plan, inside the control plan, with every safety-critical joint to spec and the cure window protected.

PlanSequence the shift first, so the cure window and the brake-tes…

Sequence the shift first, so the cure window and the brake-test slot are protected. Simulate the roof-to-sidewall weld sequence on the twin before the first seam. Read every torque trace at the station. Fuse inspection continuously. Hold any heat-input change for a human.

ThoughtThe standing weld procedure runs the roof joints hot enough to…

The standing weld procedure runs the roof joints hot enough to guarantee penetration on a cold fixture. With the clamping plan from the twin the same penetration holds at 2% less heat input and the door aperture stays inside tolerance, because the distortion is sequenced out rather than reworked out.

Actiontwin.simulate(candidates=18) returns sequence #6: roof joints …

twin.simulate(candidates=18) returns sequence #6: roof joints re-ordered, clamping plan 6, heat input down 2% on the roof joints.

ObservationSequence #6 predicts door-aperture deviation 0.6 mm against a …

Sequence #6 predicts door-aperture deviation 0.6 mm against a 1.5 mm tolerance. Three candidates scored lower on heat input but pushed predicted sidewall distortion past the limit and were discarded.

ActionRecommend sequence #6 to the shell line; six recommendations p…

Recommend sequence #6 to the shell line; six recommendations permitted; the heat-input change routed to the shift weld engineer with the twin evidence.

ObservationTwo traction-motor mounting traces on bogie B-14 fell outside …

Two traction-motor mounting traces on bogie B-14 fell outside the expected profile at 07:40:12. Routed to rework before brake test; the slot held. One masking misalignment on the door band flagged in booth 2 before the second coat.

OutcomeScenario complete. Shell inside tolerance, bogie joints to spe…

Scenario complete. Shell inside tolerance, bogie joints to spec after rework, livery inside the cure window, marriage interface inside tolerance. Car 07 released with full genealogy.

Accelerated computing

Physical AI, at the station

A seam is welded in seconds and a booth cannot wait for the cloud. Perception has to be local, deterministic and fast, so Railira runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

8 to 32 cameras per process area plus metrology, torque, thermal, robot and booth-instrument streams fused at the plant edge. Sub-50 ms weld and seam alerts and sub-150 ms coating and metrology prompts are the design targets. Jetson Thor is planned for higher sensor density.

Triton · NIM

Model serving

Weld-defect, geometry-risk, coating-risk, point-cloud and takt-risk models served at the plant edge with per-model versioning and rollback, routed by latency, tenant, sensitivity and cost.

DGX or HGX · NeMo

Training

Weld and coating defect vision, metrology classification, control-plan reasoning and FEA-surrogate models fine-tuned on plant data and engineer corrections. 100 to 500 GPU-hours per plant during onboarding is the design target; dedicated capacity is planned.

Omniverse · OVX

Train-and-plant twin

As-built carbody, coating, marriage and line-flow twin. Weld distortion, geometry build-up, robot reach, coating coverage and layout simulated before the shift. GPU FEA and point-cloud metrology are the workloads; OVX scale is planned.

Cosmos · Omniverse Replicator

Synthetic data

Rare weld defects, coating contamination, geometry deviations, occluded seams and torque-escape cases generated and validated against real inspection distributions before promotion. Planned.

cuOpt

Optimisation

Line sequencing, JIS feeding, AMR and AGV routing, buffer management and commissioning-slot scheduling against live readiness.

Isaac · Isaac ROS

Robot cells

Robotic weld, coating and assembly cells and AMR or AGV flow; path variants validated in simulation before release to the floor.

RAPIDS

GPU ETL

Telemetry features from weld parameters, metrology, coating readings, torque, non-conformance and takt history for retraining, drift detection and network analytics.

Guardrails

An agent that can change a weld sequence needs a leash

Railira writes to production systems. Every capability is scoped, every write is policy-checked against the approved control plan, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent acts only through an explicit tool allow-list, inside per-tool rate and magnitude limits and the approved control-plan envelope for the car type.
  • Policy engine before every write. Autonomy level, shift, car type, interlock state and operator presence are evaluated before a recommendation becomes a write to a robot, MES, torque tool or work package.
  • Human-in-the-loop gates. Heat-input and weld-sequence changes, schedule release and car release wait for a named approver. High-risk changes remain human-approved until IRIS, plant and OEM acceptance is earned.
  • Immutable audit log. Append-only and exportable. Every action records source evidence, the control-plan envelope, confidence, estimated quality and takt impact, rollback path, approver and car scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the robot, PLC or station's last known-good state. Safety systems and interlocks are never in Railira's path.
  • Tenant and program isolation. Designs, control plans, program data, models and memory never cross a customer boundary. On-prem and plant-edge deployment is available for regulated plants.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type I and OEM cyber reviewCloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
IRIS and regulatory assurance packagesDisposition and genealogy evidence QUEUED Planned, 6 to 12 months; not a certification claim
Standards-cited reasoningControl plans, EN 15085, IRIS / ISO/TS 22163, TSI, AAR, APTA, torque and brake-test procedures RUNNING In the design, every answer cites its source
Per-tenant and program isolationDesigns, control plans, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentRegulated plants RUNNING Design option

Read the security overview

FAQ

Straight answers

The questions plant directors, body and coating engineers and quality leads ask in the first meeting.

Only within an explicit tool allow-list with per-tool rate and magnitude limits, inside the approved control-plan envelope, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Railira writes nothing. Heat-input and weld-sequence changes, schedule release and car release stay with a named approver.

Get started

Check your stack

Start with one carbody, bogie, coating, fit-out or sequencing process and one measurable baseline. A paid pilot on weld and geometry, torque assurance, livery defects or line sequencing shows the number before you commit further.